
Fixtures that are needed
“The Roysdon Model 2 is well underway, but there are some specialized fixtures that are needed. For example, while the top and bottom of the bracelet is machined on an Elara CNC mill, a 4th axis operation is required to drill the holes for the screws that connect each link. This 4th axis fixture is used for the following operations:
- ball-mill and endmill finish-pass on the right and left side of each link
- endmill finish-pass on the front and back of each link
- drill the holes for the screws that connect each link (top video)
- drill the holes for the spring bars in the clasp (middle video)
- drill the holes in the clasp retainer (the part that keeps the clasp closed)
- mill the holes for the clasp release buttons (bottom video)
This fixture took 2 months to design in Fusion 360 and over 100 hours to machine on the NSCNC Elara Mill.”














